Item Coversheet

Santa Barbara Unified School District


Item Title:Approval of Proposal from Kruger Bensen Ziemer Architects Inc, for Gym Roof Arch Repair at San Marcos High School
Agenda Title:Approval of Proposal from Kruger Bensen Ziemer Architects Inc, for Gym Roof Arch Repair at San Marcos High School
Background:
As part of the Measure Q 2010 projects for Marcos High School, the replacement of the gym roof was approved and is nearing completion. During the roof replacement project it was noted that the bottom of the structural arches on the parking lot side of the gym have deteriorated to the point that one of the arches required immediate attention and a temporary stabilization is being accomplished as a change order to the roofing project.
 
This assignment is for the design of the permanent structural repair to the 10 arches and would be an addition to the expected project list for Measure Q 2010 bond funds. The district will apply for facilities hardship funds from the state as this is project should qualify based on the required structural repair.            
Recommendation:The Board of Education Approve the Proposal from Kruger Bensen Ziemer Architects Inc, for Gym Roof Arch Repair at San Marcos High School
Resource Person:David J. Hetyonk, Director of Facilities & Operations
Fiscal Impact:$32,200 
Funding Source:Measure Q 2010 (fund 27)

ATTACHMENTS:
File Name
SMHS_Gym_Arch_Repair_AIA_Document_B101.pdf