Item Title:Presentation on DPHS Stadium Master Plan and Allocation of Measure Q Bond Funds for Phase I Matching Contribution
Agenda Title:Presentation on DPHS Stadium Master Plan and Allocation of Measure Q Bond Funds for Phase I Matching Contribution
Background:
The Dos Pueblos High School Chargers Association is in the process of developing a Stadium Master Plan. The phasing of the plan is anticipated as follows:
 
Phase I – field and track
Phase II – press box
Phase III – visitor’s restroom and concession stand
Phase IV – new entrance plaza, meeting rooms and flex space
Phase V – additional storage, multipurpose space
 
Attached are schematic drawings of the project. The Chargers Association will make a presentation to the Board for moving forward with Phase I and requesting an allocation of $625,000 for this phase, which will resurface the all weather track and replace the turf with the same systems and products that were installed at San Marcos High School.      
Recommendation:The Board Review the Proposed Master Plan for the Stadium at Dos Pueblos High School and Allocate $650,000 in Measure Q Bond Funds for Phase I of the Plan  
Resource Person:
David J. Hetyonk, Director of Facilities & Operations
Shawn Carey, Dos Pueblos High School Principal
Fiscal Impact:$625,000
Funding Source:Measure Q Bond Funds (fund 27)

ATTACHMENTS:
File Name
12045_DPHS_Stadium_Master_Plan_01_Site_Plan(1).pdf
12045_DPHS_Stadium_Master_Plan_02_Birds_Eye_from_NE(1).pdf
12045_DPHS_Stadium_Master_Plan_03_Birds_Eye_from_SE(1).pdf
12045_DPHS_Stadium_Master_Plan_04_Building_Plans(1).pdf